ProntoForms ROI case study: Floating Gas Facility

March 10, 2023 - ROI Case Studies X52

This floating liquid natural gas facility (FLNG) achieved a 332% average annual ROI and payback period of 4.8 months from its ProntoForms deployment. Prior to ProntoForms, the FLNG managed its forms through a legacy solution and paper forms, which lacked configurability, connectivity, and visibility. This prevented metric tracking and root-cause analysis, slowed inspections, threatened operational shutdowns due to human error, and required extensive labor for manual data entry. Since deploying ProntoForms, the facility digitized and democratized its form processes. The facility reduced technician travel expenses, eliminated reliance on third-party services to manage data gathered from brownfield projects, saved 3,000 work hours per year, and empowered non-technical users with reporting and analytics capabilities on multiple devices and across business processes.